Wastewater enters the primary settlement chamber [A] where large solids are removed by settlement and flotation. An accumulation forms at the base of the tank and is removed by desludging
The clarified water is then transferred to the main aeration chamber [B]. Here it is treated to remove dissolved constituents. Aerobic bacteria, supported by diffused air, ensures full treatment is achieved before the effluent and ‘sloughed off’ bacteria flows to the filter chamber [C] for further solids removal.
The final effluent is then discharged to a water course via the final settlement chamber [D].
KEY
- InletInlet
- Debris barrier
- Air diffusers
- Polylok tertiary filter
- Outlet
- Air pump connection
7. Recirculation to primary chamber
8. Air vent
9. Access covers (Available in brown or green)
10. Heavy duty shell
11. Compressor with alarm
12. Accoustic compressor housing
Benefits
- Available in three sizes – 2, 3 or 5 person units (gravity or pumped outlet)
- Compact, lightweight construction – No heavy plant required
- Portable – Systems can be installed above ground and removed/stored when not in use
- Cost effective installation – Below ground installation can be achieved in approximately 2 hours
- Outstanding treatment efficiency – 14:19:0.7mg/ltr (BOD:Suspended solids:Ammonia)
- Near silent air compressor – Ensures minimal running, maintenance and servicing costs
- Electrical consumption: 1.8kWh/d – Equivalent to the daily use of a lightbulb
- CE approved to BS EN 12566
- Fire resistance tested in accordance with EN ISO 11925-2:210
- Tested for structural integrity in accordance with EN ISO 179-1/1eA
- Neck extensions are available for deeper installations
Specifications
Model | People served | Length +/- 50mm |
Width +/- 50mm |
Height +/- 50mm |
Inlet invert | Outlet invert | In/out dia |
---|---|---|---|---|---|---|---|
M2 | Up to 2 | 2750 | 980 | 415 | 445 | 270 | 110 |
M3 | Up to 3 | 2050 | 1500 | 600 | 450 | 245 | 110 |
M5 | Up to 5 | 2640 | 1500 | 800 | 650 | 345 | 110 |